The project executed by TTA on a turn-key basis, included studies, design and engineering of production, storage, management and control systems, supply and installation of standalone solar PV hybrid plants and, one with wind energy as well, with a total capacity of 48 kWp, in remote communities in the Northern and Volta Regions for 15 CHP Health Compounds. The systems have been designed for two days’ battery autonomy at the rated consumption. Services also included Users’ Manual elaboration and technical and final user initial and refreshment training.