TTA was the overall project coordinator and head of technological activities, which included studies, design and specifications; studies of the targeted countries regarding network characteristics, legal framework for grid-connected PV, supervision of selected pilot projects; monitoring of installations, training and capacity building.
The specific objectives of this mandate aimed at:
o The use of PV energy to reduce energy costs
o The use of transitional battery to prevent cuts when grid interruptions before starting diesel generators
o The use of PV energy to reduce fuel consumption
o Streamlining of investment in power electronic equipment