Hybrid (grid-diesel-PV) 228 kWp PV rooftop installation – Sustainability of the Gonaives Hospital.
Project completed for:
United Nations Office for Project Services (UNOPS)
Country:
Haiti
Project start-up:
01-02-2014
Project End Date:
01-07-2015

The objective of the project was to Design, Install and Commission a Photovoltaic (PV) plant that will supply renewable electricity to the La Providence Hospital in Gonaives. The PV plant will be required to operate in parallel with either the EDH Grid or the Generators (3 units of 180 kW) installed at the Hospital, two supply systems that switch between each other depending on grid quality and stability. The size of the PV plant has been set to 200 kVA (inverter power) and 228 kWp.

Related projects

Greece, Lebanon, Palestine, Spain

CERES – Centers of Excellence (CoE) for Resilient Entrepreneurship and Sustainable Solutions | European Union – Interreg NEXT MED Programme (Co-funded by the European Union)

Papua New Guinea (PNG)

Micro Grids Site Identification Study for the PNG National Energy Access Transformation Project (NEAT)

Federated States of Micronesia (FSM)

Owner’s Engineer for Chuuk Public Utility Corporation (CPUC)

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.