The objective of the project was to Design, Install and Commission a Photovoltaic (PV) plant that will supply renewable electricity to the La Providence Hospital in Gonaives. The PV plant will be required to operate in parallel with either the EDH Grid or the Generators (3 units of 180 kW) installed at the Hospital, two supply systems that switch between each other depending on grid quality and stability. The size of the PV plant has been set to 200 kVA (inverter power) and 228 kWp.