Construction of the Cerro San Simon Hybrid Solar Plant
Project completed for:
Programa de Electricidad para Vivir con Dignidad (PEVD)
Country:
Bolivia
Project start-up:
01-12-2021
Project End Date:
01-11-2022

Design, engineering, procurement, construction and installation of the Cerro San Simón solar photovoltaic power plant, including commissioning and operation, as well as the distribution network. The services also included a tariff model proposal and the configuration of smart meters, and training of operations’ staff and users.

Related projects

Greece, Lebanon, Palestine, Spain

CERES – Centers of Excellence (CoE) for Resilient Entrepreneurship and Sustainable Solutions | European Union – Interreg NEXT MED Programme (Co-funded by the European Union)

Papua New Guinea (PNG)

Micro Grids Site Identification Study for the PNG National Energy Access Transformation Project (NEAT)

Federated States of Micronesia (FSM)

Owner’s Engineer for Chuuk Public Utility Corporation (CPUC)

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.