Design of a power conditioning and the design and installation of two PV systems. Both the power conditioning prototype and the followed the D4R (Design for Recycling, Repair, Refurbishment and Reuse) criteria defined within the project. Some of the measures implemented were: the use of off-spec PV modules, the structures supporting the PV modules are made of elements originated as waste in construction or demolition site, reuse of cabling and protections, use of li-ion batteries…
Moreover, the strategy of use has been also innovative: grid-connected PV systems with li-ion storage.