Updated Feasibility Study & Detailed Design of a Hybrid Power System, at Mirwais Regional Hospital in Kandahar
Proyecto realizado para:
International Committee of the Red Cross (ICRC)
País:
Afghanistan
Inicio del Proyecto:
01-08-2021
Fecha de Finalización:
01-12-2023

The Mirwais Regional Hospital is the referral hospital for Afghanistan’s four southern provinces, with a coverage population of approximately 4 million people.
This mandate comprised the feasibility study and the design of a PV solar hybrid system adapted to the existing site conditions while operating most efficiently depending on the load and the availability of the existing power sources (grid, diesel, solar, BESS).
The system’s implementation is carried out in two phases. In Phase 1, ICRC tendered the construction of the on-grid PV power plant, for which the Consultant provided construction supervision services. The storage system (BESS) has been designed but will be implemented in a second phase, which is not part of this project.

Proyectos relacionados

Greece, Lebanon, Palestine, Spain

CERES – Centers of Excellence (CoE) for Resilient Entrepreneurship and Sustainable Solutions | European Union – Interreg NEXT MED Programme (Co-funded by the European Union)

Papua New Guinea (PNG)

Micro Grids Site Identification Study for the PNG National Energy Access Transformation Project (NEAT)

Federated States of Micronesia (FSM)

Owner’s Engineer for Chuuk Public Utility Corporation (CPUC)

Ce site est enregistré sur wpml.org en tant que site de développement. Passez à un site de production en utilisant la clé remove this banner.