{"id":16159,"date":"2025-09-24T16:59:59","date_gmt":"2025-09-24T16:59:59","guid":{"rendered":"https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii"},"modified":"2025-12-09T09:15:41","modified_gmt":"2025-12-09T09:15:41","slug":"provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii","status":"publish","type":"projects","link":"https:\/\/ttaenergy.com\/fr\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii","title":{"rendered":"Provision of consultancy services to deliver Papua New Guinea Off-Grid Code and Associated Regulations (Phase I and Phase II)"},"content":{"rendered":"<p>TTA was responsible for the preparation of the PNG Off-Grid Regulation for Small Power Systems, a complete regulatory framework covering any off-grid project to be implemented in PNG with a combined capacity under 1MW. The regulation covers, among others: registration and licensing procedures; tariff setting; technical, social, and environmental requirements; service and electricity quality requirements; interconnection procedures; and complaint procedures and dispute resolution mechanisms. TTA also prepared the application and reporting forms, as well as the contract templates.<br \/>\nThe regulation was drafted following a very extensive stakeholder engagement structured in three phases. This approach was instrumental in ensuring that the regulation be prepared with a pragmatic mindset and tailored to the needs of PNG.<br \/>\nDuring the initial phase, TTA conducted one-on-one sessions with the country\u2019s major stakeholders, including government agencies, donors, academia, and the private sector. A total of 15 meetings were conducted in 2020, some of them physically, some virtually, focusing on identifying key sector challenges and regulatory preferences. The results of this initial consultation phase were elaborated into The Guiding Principles. These principles synthesized the main requests and priorities of the sector and became the cornerstones of the future regulation.<br \/>\nIn the second phase of stakeholder engagement, the Consultant presented The Guidelines, an extensive document describing in detail the proposed key features of the future PNG Off-Grid Regulation. The purpose of the document was to justify, validate and document the most relevant decisions made in preparation for the regulation. These Guidelines were presented first to Independent Consumer and Competition Commission (ICCC) by the end of 2020 and then, in early 2021, to the overall sector through focal group discussions, targeting the private sector, academia, government agencies, and donors separately.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TTA was responsible for the preparation of the PNG Off-Grid Regulation for Small Power Systems, a complete regulatory framework covering any off-grid project to be implemented in PNG with a combined capacity under 1MW. The regulation covers, among others: registration and licensing procedures; tariff setting; technical, social, and environmental requirements; service and electricity quality requirements; [&hellip;]<\/p>\n","protected":false},"featured_media":19346,"template":"","format":"standard","meta":{"_jf_save_progress":"","codigo":"CI-20-0002","proyecto_realizado_para":"United Nations Development Programme (UNDP)","tta_category":["MINIGRIDS","OFF-GRID PV POWER PLANTS AND SOLAR KITS","CONSULTANCY"],"footnotes":""},"class_list":["post-16159","projects","type-projects","status-publish","format-standard","has-post-thumbnail","hentry"],"_wp_attached_file":null,"_wp_attachment_metadata":null,"_menu_item_type":null,"_menu_item_menu_item_parent":null,"_menu_item_object_id":null,"_menu_item_object":null,"_menu_item_target":null,"_menu_item_classes":null,"_menu_item_xfn":null,"_menu_item_url":null,"elementor_font_files":null,"elementor_font_face":null,"_entry_type":null,"_listing_data":null,"_listing_type":null,"position":null,"_content":null,"_wpcode_auto_insert":null,"_wpcode_auto_insert_number":null,"_wpcode_library_id":null,"_wpcode_conditional_logic_enabled":null,"_wpcode_priority":null,"_wpcode_note":null,"_wpcode_location_extra":null,"_wpcode_shortcode_attributes":null,"ano":null,"contenido":null,"_jet_menu_content_type":null,"_is_deps_ready":null,"_is_style_deps":null,"_is_script_deps":null,"jet_menu_settings":null,"jet-menu-item":null,"_content_type":null,"intro":null,"gallery_tab":null,"gallery":null,"gallery_name":null,"tta_gallery":null,"points_info":null,"_oembed_7befe71c04536851b6485e7b012d3f0d":null,"_oembed_time_7befe71c04536851b6485e7b012d3f0d":null,"gallery_656":null,"titulo":null,"gallery_464":null,"_filter_type":null,"_data_source":null,"_is_hierarchical":null,"_ih_source_map":null,"_ih_terms_orderby":null,"_ih_terms_orderby_meta_value":null,"_ih_terms_order":null,"_query_switcher_notice":null,"_query_builder_queries_to_switch":null,"_query_builder_query":null,"_query_builder_value_prop":null,"_query_builder_label_prop":null,"_source_manual_input":null,"_source_taxonomy":null,"_terms_orderby":null,"_terms_orderby_meta_value":null,"_terms_order":null,"_terms_relational_operator":null,"_placeholder":null,"_source_manual_input_range":null,"_source_callback":null,"_source_min":null,"_source_max":null,"_source_step":null,"_values_prefix":null,"_values_suffix":null,"_range_inputs_enabled":null,"_range_inputs_separators_enabled":null,"_values_decimal_num":null,"_values_decimal_sep":null,"_values_thousand_sep":null,"_date_source":null,"_date_type":null,"_date_format":null,"_date_from_placeholder":null,"_date_to_placeholder":null,"_date_period_type":null,"_date_period_datepicker_button_text":null,"_date_available_range":null,"_date_available_range_custom_min":null,"_date_available_range_custom_max":null,"_date_available_range_custom_info":null,"_date_period_start_end_enabled":null,"_date_period_format":null,"_date_period_start_format":null,"_date_period_separator":null,"_date_period_end_format":null,"_date_period_date_formats_info":null,"_source_post_type":null,"_glossary_id":null,"_glossary_notice":null,"_add_all_option":null,"_all_option_label":null,"_ability_deselect_radio":null,"_rating_options":null,"_rating_compare_operand":null,"_alphabet_behavior":null,"_alphabet_radio_deselect":null,"_alphabet_options":null,"_s_by":null,"_s_placeholder":null,"_color_image_type":null,"_query_builder_color_prop":null,"_query_builder_image_prop":null,"_color_image_behavior":null,"_source_color_image_input":null,"_color_image_add_all_option":null,"_color_image_add_all_option_lael":null,"_color_image_add_all_option_image":null,"_color_image_ability_deselect_radio":null,"_show_empty_terms":null,"_only_child":null,"_group_by_parent":null,"_group_collapsible":null,"_source_custom_field":null,"_source_get_from_field_data":null,"_custom_field_source_plugin":null,"_is_custom_checkbox":null,"_use_exclude_include":null,"_data_exclude_include":null,"_query_var":null,"_is_custom_query_var":null,"_custom_query_var":null,"_query_compare":null,"_is_default_filter_value":null,"_default_filter_value":null,"_default_filter_value_info":null,"_default_filter_value_info_hierarchical":null,"_default_filter_value_info_range":null,"_default_filter_value_info_date":null,"_default_filter_value_info_multiple":null,"_filter_label":null,"_active_label":null,"imagen":null,"subir_archivo":null,"url":null,"archive":null,"pdf":null,"gallery_656_tab":null,"sub_titulo":null,"_wp_attachment_image_alt":null,"_wpcode_conditional_logic":null,"_oembed_e86a668bc3ee7c5a958c2d92b24e4e1a":null,"_oembed_time_e86a668bc3ee7c5a958c2d92b24e4e1a":null,"_oembed_3f6d6376e82defc5845a7849eeb3edca":null,"_oembed_bed9ea28b9142e17c5a2b2dc57b83ec2":null,"_oembed_time_bed9ea28b9142e17c5a2b2dc57b83ec2":null,"_oembed_e8774cfe25a0193042b87ecd3fb0c44e":null,"_oembed_time_e8774cfe25a0193042b87ecd3fb0c44e":null,"region_info":null,"globe_id_select":null,"globe_info":null,"titile":null,"wpml_media_processed":null,"_icl_lang_duplicate_of":null,"_oembed_445ecc46dc6835ff68f37644727e0408":null,"_oembed_time_445ecc46dc6835ff68f37644727e0408":null,"_oembed_dc42113d5204e1d9a965e152fea8eac2":null,"_oembed_time_dc42113d5204e1d9a965e152fea8eac2":null,"_oembed_6341e930caa1a62817d976c18d83bb6a":null,"_oembed_47a65fa45bff1986942b7b6655fb5f9d":null,"_oembed_time_47a65fa45bff1986942b7b6655fb5f9d":null,"code":null,"project_number":null,"latitude":null,"longitude":null,"_cct_notice":null,"_cct_checkboxes_info":null,"ID":null,"language":null,"_menu_item_orphaned":null,"_oembed_694628a381d204d95e22fe7db271b623":null,"_oembed_time_694628a381d204d95e22fe7db271b623":null,"_wp_attachment_backup_sizes":null,"donde_mostrar":null,"name":null,"geographical_regi":null,"position_in_tta":null,"email":null,"proyecto_realizado_para":"United Nations Development Programme (UNDP)","project_status":"Completed","start_date":"2020-01-01","end_date":"2022-04-30","country":"Papua New Guinea (PNG)","tta_category":["MINIGRIDS","OFF-GRID PV POWER PLANTS AND SOLAR KITS","CONSULTANCY"],"galery_image_2":"19349","galery_image_3":"19352","galery_image_4":"19355","galery_image_5":"19358","_wp_attachment_context":null,"_elementor_inline_svg":null,"_elementor_edit_mode":null,"_elementor_template_type":null,"_elementor_source":null,"_elementor_version":null,"_elementor_pro_version":null,"_edit_lock":null,"_wp_page_template":null,"_elementor_data":null,"_elementor_conditions":null,"_elementor_page_settings":null,"_edit_last":null,"_thumbnail_id":"19346","_wp_old_date":null,"image":null,"_elementor_controls_usage":null,"_dp_original":null,"globe_id":null,"order_number":null,"_elementor_oembed_cache":null,"_elementor_screenshot_failed":null,"_wp_old_slug":null,"_wp_desired_post_slug":null,"_wpml_word_count":"361","_wpml_location_migration_done":null,"_wpml_media_duplicate":null,"_wpml_media_featured":null,"location":null,"_last_translation_edit_mode":null,"_top_nav_excluded":null,"_cms_nav_minihome":null,"_elementor_template_widget_type":null,"_elementor_popup_display_settings":null,"codigo":"CI-20-0002","_wp_trash_meta_status":null,"_wp_trash_meta_time":null,"_elementor_css":null,"_elementor_page_assets":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Papua New Guinea Off-Grid Regulation Consultancy Services<\/title>\n<meta name=\"description\" content=\"Discover expert consultancy services for Papua New Guinea&#039;s Off-Grid Code regulations. Ensure compliance and successful project execution with our tailored solutions.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Papua New Guinea Off-Grid Regulation Consultancy Services\" \/>\n<meta property=\"og:description\" content=\"Discover expert consultancy services for Papua New Guinea&#039;s Off-Grid Code regulations. Ensure compliance and successful project execution with our tailored solutions.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii\" \/>\n<meta property=\"og:site_name\" content=\"TTA\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-09T09:15:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ttaenergy.com\/wp-content\/uploads\/2025\/12\/v7aivoym6xfb7jjfdltj-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"810\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii\",\"url\":\"https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii\",\"name\":\"Papua New Guinea Off-Grid Regulation Consultancy Services\",\"isPartOf\":{\"@id\":\"https:\/\/ttaenergy.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii#primaryimage\"},\"image\":{\"@id\":\"https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii#primaryimage\"},\"thumbnailUrl\":\"https:\/\/ttaenergy.com\/wp-content\/uploads\/2025\/12\/v7aivoym6xfb7jjfdltj-1.jpg\",\"datePublished\":\"2025-09-24T16:59:59+00:00\",\"dateModified\":\"2025-12-09T09:15:41+00:00\",\"description\":\"Discover expert consultancy services for Papua New Guinea's Off-Grid Code regulations. Ensure compliance and successful project execution with our tailored solutions.\",\"breadcrumb\":{\"@id\":\"https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii#primaryimage\",\"url\":\"https:\/\/ttaenergy.com\/wp-content\/uploads\/2025\/12\/v7aivoym6xfb7jjfdltj-1.jpg\",\"contentUrl\":\"https:\/\/ttaenergy.com\/wp-content\/uploads\/2025\/12\/v7aivoym6xfb7jjfdltj-1.jpg\",\"width\":1080,\"height\":810},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/ttaenergy.com\/fr\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Provision of consultancy services to deliver Papua New Guinea Off-Grid Code and Associated Regulations (Phase I and Phase II)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/ttaenergy.com\/#website\",\"url\":\"https:\/\/ttaenergy.com\/\",\"name\":\"TTA\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/ttaenergy.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Papua New Guinea Off-Grid Regulation Consultancy Services","description":"Discover expert consultancy services for Papua New Guinea's Off-Grid Code regulations. Ensure compliance and successful project execution with our tailored solutions.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii","og_locale":"fr_FR","og_type":"article","og_title":"Papua New Guinea Off-Grid Regulation Consultancy Services","og_description":"Discover expert consultancy services for Papua New Guinea's Off-Grid Code regulations. Ensure compliance and successful project execution with our tailored solutions.","og_url":"https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii","og_site_name":"TTA","article_modified_time":"2025-12-09T09:15:41+00:00","og_image":[{"width":1080,"height":810,"url":"https:\/\/ttaenergy.com\/wp-content\/uploads\/2025\/12\/v7aivoym6xfb7jjfdltj-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Dur\u00e9e de lecture estim\u00e9e":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii","url":"https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii","name":"Papua New Guinea Off-Grid Regulation Consultancy Services","isPartOf":{"@id":"https:\/\/ttaenergy.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii#primaryimage"},"image":{"@id":"https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii#primaryimage"},"thumbnailUrl":"https:\/\/ttaenergy.com\/wp-content\/uploads\/2025\/12\/v7aivoym6xfb7jjfdltj-1.jpg","datePublished":"2025-09-24T16:59:59+00:00","dateModified":"2025-12-09T09:15:41+00:00","description":"Discover expert consultancy services for Papua New Guinea's Off-Grid Code regulations. Ensure compliance and successful project execution with our tailored solutions.","breadcrumb":{"@id":"https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii#primaryimage","url":"https:\/\/ttaenergy.com\/wp-content\/uploads\/2025\/12\/v7aivoym6xfb7jjfdltj-1.jpg","contentUrl":"https:\/\/ttaenergy.com\/wp-content\/uploads\/2025\/12\/v7aivoym6xfb7jjfdltj-1.jpg","width":1080,"height":810},{"@type":"BreadcrumbList","@id":"https:\/\/ttaenergy.com\/projects\/provision-of-consultancy-services-to-deliver-papua-new-guinea-off-grid-code-and-associated-regulations-phase-i-and-phase-ii#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ttaenergy.com\/fr"},{"@type":"ListItem","position":2,"name":"Provision of consultancy services to deliver Papua New Guinea Off-Grid Code and Associated Regulations (Phase I and Phase II)"}]},{"@type":"WebSite","@id":"https:\/\/ttaenergy.com\/#website","url":"https:\/\/ttaenergy.com\/","name":"TTA","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ttaenergy.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"}]}},"_links":{"self":[{"href":"https:\/\/ttaenergy.com\/fr\/wp-json\/wp\/v2\/projects\/16159","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ttaenergy.com\/fr\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/ttaenergy.com\/fr\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":1,"href":"https:\/\/ttaenergy.com\/fr\/wp-json\/wp\/v2\/projects\/16159\/revisions"}],"predecessor-version":[{"id":16160,"href":"https:\/\/ttaenergy.com\/fr\/wp-json\/wp\/v2\/projects\/16159\/revisions\/16160"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ttaenergy.com\/fr\/wp-json\/wp\/v2\/media\/19346"}],"wp:attachment":[{"href":"https:\/\/ttaenergy.com\/fr\/wp-json\/wp\/v2\/media?parent=16159"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}