Construction of the Cerro San Simon Hybrid Solar Plant
Proyecto realizado para:
Programa de Electricidad para Vivir con Dignidad (PEVD)
País:
Bolivia
Inicio del Proyecto:
01-12-2021
Fecha de Finalización:
01-11-2022

Design, engineering, procurement, construction and installation of the Cerro San Simón solar photovoltaic power plant, including commissioning and operation, as well as the distribution network. The services also included a tariff model proposal and the configuration of smart meters, and training of operations’ staff and users.

Proyectos relacionados

Greece, Lebanon, Palestine, Spain

CERES – Centers of Excellence (CoE) for Resilient Entrepreneurship and Sustainable Solutions | European Union – Interreg NEXT MED Programme (Co-funded by the European Union)

Papua New Guinea (PNG)

Micro Grids Site Identification Study for the PNG National Energy Access Transformation Project (NEAT)

Federated States of Micronesia (FSM)

Owner’s Engineer for Chuuk Public Utility Corporation (CPUC)

Este sitio está registrado en wpml.org como sitio de desarrollo. Cambia a una clave de sitio de producción en remove this banner.